| DEFIANCE COUNTY ENGINEER | ||||||
| Kiser Road (TR30) Reconstruction | ||||||
| Bid Date | 7/21/2008 | |||||
| Engineer's Estimate: | $ 266,268.47 | |||||
| NO BIDS RECEIVED | ||||||
| Item | Description | Quantity | Units | |||
| Roadway & Channel | ||||||
| 201 | Clearing and Grubbing | 1 | Lump | |||
| 202 | Pipe Removed 24" and under | 493 | Foot | |||
| 203 | Excavation, As Per Plan | 3960 | Cu. Yd. | |||
| 203 | Embankment | 2327 | Cu. Yd. | |||
| 204 | Subgrade Compaction | 5091 | Sq. Yd. | |||
| Special | Mailbox Support System, Single | 7 | Each | |||
| Erosion Control | ||||||
| 601 | Rock Channel Protection, Type C w/ filter | 10 | Cu. Yd. | |||
| 659 | Seeding and Mulching | 25786 | Sq. Yd. | |||
| 659 | Comercial Fertilizer | 2.32 | Tons | |||
| 659 | Water | 70 | M Gal | |||
| Drainage | ||||||
| 603 | 4" Conduit, Type E | 678 | Foot | |||
| 603 | 4" Conduit, Type F | 50 | Foot | |||
| 603 | 6" Conduit, Type E | 50 | Foot | |||
| 603 | 6" Conduit, Type F | 50 | Foot | |||
| 603 | 8" Conduit, Type E | 50 | Foot | |||
| 603 | 8" Conduit, Type F | 50 | Foot | |||
| 603 | 10" Conduit, Type E | 25 | Foot | |||
| 603 | 10" Conduit, Type F | 25 | Foot | |||
| 603 | 12" Conduit, Type B | 25 | Foot | |||
| 603 | 12" Conduit Type A As Per Plan * | 74 | Foot | |||
| 603 | 12" Conduit, Type D | 494 | Foot | |||
| 603 | 12" Conduit, Type E | 50 | Foot | |||
| 603 | 12" Conduit, Type F | 50 | Foot | |||
| 603 | 15" Conduit Type C As Per Plan * | 10 | Foot | |||
| 603 | 18" Conduit Type A As Per Plan * | 22 | Foot | |||
| 603 | 18" Conduit Type D | 80 | Foot | |||
| 603 | 24" Conduit Type A As Per Plan * | 23 | Foot | |||
| Pavement | ||||||
| 304 | Aggregate Base | 1783 | Cu. Yd. | |||
| 407 | Tack Coat | 1833 | Gal | |||
| 408 | Prime Coat | 1514 | Gal | |||
| 448 | Asphalt Concrete Surface Course Type 1 PG64-22 | 601 | Tons | |||
| 448 | Asphalt Concrete Intermediate Course Type 2 PG64-22 | 889 | Tons | |||
| Miscellaneous | ||||||
| 614 | Maintaining Traffic | 1 | Lump | |||
| 623 | Construction Layout Stakes | 1 | Lump | |||
| 624 | Mobilization | 1 | Lump | |||
| 604 | Monument Assemblies | 2 | Each | |||
| TOTAL | ||||||