Permits & Inspection Fees
Effective August 20, 2007
No charge for
permit or inspection, unless unusual installation is required.
NOTE: Installation must be inspected.
No charge for
permit or inspection, unless unusual installation is required.
NOTE: Installation must be inspected.
$10.00 –
Processing fee for initial inspection to develop specifications
$25.00 – Issuance
of permit and final inspection
Sanitary/Storm water Discharge
Permit
$10.00 –
Processing fee for initial inspection to develop specifications
$25.00 – Issuance
of permit and final inspection
$10.00 – Single move trip overweight/oversized vehicle
$25.00 – Single
move trip & return for overweight/oversized vehicle – Valid for 14 days
$5.00 – Additional 14 day extension
$35.00 – Special
overweight (Super Loads) which covers the cost of prior route inspection,
videotaping, etc.
$25.00 – Annual
over weight/oversize per truck in any one company ( Up to 4 trucks)
$125.00 – Annual
for fleet in any one company over five trucks
NOTE: Trip endorsements required for each
trip on annual permits—no charge
All annual permits
issued are based on a calendar year and expires 12/31 of the year issued.
$25.00 + – Short
utility or aerial installation
$25.00 + – Boring,
open cuts or trenching of line in a single location
$100.00 + –
Waterline/sanitary projects, communication lines, poles, etc. for multiple
locations
+ Cost of
relocation of said utility within the right-of-way, in accordance with
utility’s policy, if required by the County Engineer
No charge for
replacement of single pole in same hole.
Inspection Fees
$40.00/hour to
cover inspector’s and clerical hour rates w/benefits
$15.00 Vehicle fee